Conversion And Resource Evaluation Ltd

  • Welcome to

    Conversion & Resource Evaluation Ltd

    Sed ut perspiciatis unde omnis iste natus error sit voluptatem, totam rem aperiam, eaque ipsa quae ab illo inventore et quasi architecto beatae vitae dicta sunt explicabo.

Contract List for C.A.R.E. Ltd.

A list of contracts since 1996 to 2026 inclusive. Where additional information [summary, report, paper, other publication, weblink] is available, request the information by clicking the REQUEST link next to the relevant entry.

Bio-energy assessment model [BEAM]- IEA Bio-Energy Systems Activity.

Year(s) duration: 1996-1997

Information available & reference number: Yes. Request Ref: 1

Design study of a 1 t/h integrated advanced fast pyrolysis process to produce liquids.

Year(s) duration: 1997

Information available: No.

Provision of catalysts and technical advice on upgrading of pyrolysis products [vapour and liquid phase upgrading].

Year(s) duration: 1995-1998

Information available: No.

Physical upgrading of fast pyrolysis liquids – a review.

Year(s) duration: 1997

Information available: No.

Development of an Advanced Fast Pyrolysis processes for power and heat – techno-economic assessment. Sub-contract.
EC contract JOR3-CT97-0197

Year(s) duration: 1998-2002

Information available & reference number: Yes. Request Ref: 2

Potential for utilisation of natural gas in biomass gasification and pyrolysis systems for power generation.

Year(s) duration: 1998

Information available: No.

The presence of organic chemicals in biomass gasification: a review of the mechanisms of formation and removal. DTI funded contract ref. B/T1/00590/00/00.

Year(s) duration: 1998-1999

Information available & reference number: Yes. Request Ref: 3

Determination of norms and standards for biomass-derived pyrolysis liquids.
EC funded contract Number 4.1030/C/00-015/2000.

Year(s) duration: 1999-2002

Information available & reference number: Yes. Request Ref: 4

Re-design of a small-scale [<100 kWe] downdraft gasifier and gas cleaning system, [achieved <12 ppm “organics” in the raw gas as independently tested].

Year(s) duration: 1998-1999

Information available & reference number: Yes. Request Ref: 5

Initial evaluation of gasification technologies for sewage sludge and related wastes for CHP application.

Year(s) duration: 1998

Information available: No.

Techno-economics of production of slow release organic fertilisers from biomass pyrolysis products. Sub-contract.
EC funded contract FAIR6-CT98-4042.

Year(s) duration: 1998-2002

Information available & referenence number: Yes. Request Ref: 6

Continuing work on biomass gasifier operation and re-design – health and safety, compliance with IPPC, gasifier operation, feedstock procurement and testing, gas quality assessment for a 140kWe spark ignition engine.

Year(s) duration: 1999-2003

Information available & referenence number: Yes. Request Ref: 7

Cost and operational acceptability improvements to gasifiers. DTI funded contract ref. B/U1/00677/00/00.

Year(s) duration: 2001-2003

Information available & referenence number: Yes. Request Ref: 8

Techno-economics of retrofitting combustion systems with novel gas cleaning technologies. BIOWARE project. EU funded contract ENK5-CT2001-00523.

Year(s) duration: 2001-2005

Information available & referenence number: Yes. Request Ref: 9

Evaluation of bio-diesel production technology for power generation from esterified beef tallow.

Year(s) duration: 2002

Information available: No.

World-wide survey for coal fired heat and power plants: < 300 MWth; < 100 MWe.

Year(s) duration: 2002

Information available: No.

Due diligence assessment of an 8 Mwe fluid bed gasification system

Year(s) duration: 2002

Information available: No.

Technical assistance on the operation of a downdraft gasifier with a Capstone C-330 micro turbine. Techno-economic assessment of gasifier + micro-turbine systems to 250 kWe.
DTI funded contract B/U1/00762.

Year(s) duration: 2001-2004

Information available & reference number: Yes. Request Ref: 10

Techno-economics of production of renewable resin from biomass derived pyrolysis liquids.
EC funded project QLK5-CT2002-RENURESIN

Year(s) duration: 2003-2006

Information available & reference number: Yes. Request Ref: 11

Expert evaluation to the European Commission DG XII.

Year(s) duration: 2003-present

Information available: No.

Market assessment of wood fuel in the UK and Ireland for use as fuel in gasification systems.

Year(s) duration: 2003

Information available: No.

Expert evaluation services to the European Commission, DG TREN.

Year(s) duration: 2003-present

Information available: No.

Technical and engineering design of a 300 kWe [gross] downdraft gasifier and gas conditioning system for combined heat and power generation on a farm in North West England.
DTI funded contract B/TI/00800/00/00.

Year(s) duration: 2002-2006

Information available & reference number: Yes. Request Ref: 12

Business planning, market analysis and size, strategy advice and assessment of pyrolysis and gasification technologies in the UK and EU.

Year(s) duration: 2003

Information available: No.                         

Assessment of EU existing biomass and waste combined heat and power plants in the EU-15 < 100 MWe output.

Year(s) duration: 2003

Information available: No.                         

Independent assessor to the UK Technology Programme [Low Carbon Energy Technologies].

Year(s) duration: 2003-2006

Information available: No.                         

Ongoing technical advice on gasifier design, economic appraisal and due diligence to UK companies.

Year(s) duration: 2003-2006

Information available & reference number: Yes. Request Ref: 13                       

Toxicity of biomass derived pyrolysis liquids. Sub-contract.
EC funded project NNE5-2001-00744-BIOTOX

Year(s) duration: 2003-2005

Information available & reference number: Yes. Request Ref: 14                      

Assessment of legislation [IPPC, LCP and WID] relating to tyre pyrolysis, UK.

Year(s) duration: 2004

Information available: No.                     

Testing of a range of biomass fuels in an 80 kWe test gasifier. Sub-contract.
DTI funded contract B/W3/00806/00/00.

Year(s) duration: 2005-2006

Information available & reference number: Yes. Request Ref: 15                    

Biomass fast pyrolysis for CHP production in a 250 kWe dual fuel diesel engine. Sub-contract.

DTI funded contract B/T3/00813/00/00

Year(s) duration: 2005-2008

Information available: No.                  

Assessment of emissions from a 50 kg/h leather waste gasifier. Recommendations on gas cleaning operations for IPPC and WID compliance.

Year(s) duration: 2004-2005

Information available and reference number: Yes. Request Ref: 16                

Market assessment of commercial pyrolysis companies producing syngas for power generation in gas engines worldwide.

Year(s) duration: 2005

Information available: No.             

Commissioning and assistance in operation of a 250 kg/h slow pyrolysis plant for char products and power generation in Australia. Assessment of process performance and scale-up to 4 t/h of dry feed material.

Year(s) duration: 2005-2006

Information available: No.             

Life Cycle Assessment of slow pyrolysis for power production at 4-8 Mwe – contribution to mass and energy balances.

Year(s) duration: 2006-2008

Information available: No.             

Scroll to Top